Thursday, November 29, 2018

Kebenaran Merancang MBPJ Complete ! The Season Finale

Today is the 29th of November, today marks the end of all the paper work, chasing, calling, holidays and all the sorts of hair loss problems I have had so far. TODAY, Step 1 is Officially Closed. No more Kebenaran Merancang with MBPJ to deal with for our House Renovation / Demolition. You think this was all easy to do ? Sure it was lowyatt folks, now you can piggy back on the free information about to be given with those who have read this blog.

What I am about to do, is show you what the Surat Kebenaran Merancang MBPJ looks like when you are renovating / demolishing a house above 1,000 square feet. This way, only idiots will remain online with lowyatt folks. All those questions that one may have about what are the rules, regulations, terms, conditions, working hours etc. may all be viewed BELOW, not on lowyatt so that YOU, will know better, the truth and nothing less of it.

However, if you have discovered this blog, I have hardly or minimal holds barred. THIS, Ladies and Gents, is what your Surat Kebenaran Merancang from MBPJ looks like when it gets approved, and THIS, Ladies and Gents is your Pengesahan Kebenaran Merancang (Validation Letter) that will allow YOU, yes YOU and all to know what it took, the head aches, documents, rejects, and time taken that was supposed to be easy, but didnt. Because lowtayy chai latte avacado toast hipsters who face the simplest heart aches of even dropping a pen down to the floor to find an excuse to take a 3 week holiday for, HAVE NO IDEA WHAT IT TAKES.

To the people who have called in, observing from a distance, and gaining any knowledge or experience as a guideline through this blog, I hope you will never suffer the same fate as me. All the questions you may have online while looking at chat rooms for MBPJ House Renovations Rules, Terms and Conditions, may be also used as a reference below help assist your needs further.

Without further adiue, I present to you, the Surat Kebenaran Mercancang MBPJ (Development Order Approval by MBPJ) and its Pengesahan Surat Kebenaran Merancang (Development Order Validation).

Surat Kebenaran Merancang MBPJ Page 1 : Your Cover Note addressed to your Town Planner


Surat Kebenaran Merancang MBPJ Page 2 : (cont.)

Surat Kebenaran Merancang MBPJ Page 3 : Terms and Conditions (cont. next 9 pages)

Surat Kebenaran Merancang MBPJ Page 4 : Read on

Surat Kebenaran Merancang MBPJ Page 5 : Safety and Engineering Department Terms


Surat Kebenaran Merancang MBPJ Page 6 : Ramp, gates etc.


Surat Kebenaran Merancang MBPJ Page 7 : Before work commences, your letter with the Commissioner for Oaths

Surat Kebenaran Merancang MBPJ Page 8 : Stop work Order, and what does it say about Workers quarters ? Now you know next time when your Cheras styles neighbours who build houses and let workers stay inside, you need an approval first, without one, lodge a complaint. 


Surat Kebenaran Merancang MBPJ Page 9 : Workers safety etc.


Surat Kebenaran Merancang MBPJ Page 10 : Nyamuk Aedes ade ke ? Takpe, developer orang Cheras, selalu dekat lowyatt


Surat Kebenaran Merancang MBPJ Page 11 : Waste Management


Surat Kebenaran Merancang MBPJ Page 12 : Law and Order, something Cheras people really know well and abide by


Surat Kebenaran Merancang MBPJ Page 13 : The date the MBPJ Planning Department approved by person of high authority.


Remember, there are 10 plans to be Endorsed in the tail end of the Kebenaran Mercancang MBPJ process ? Well here is one of them that will be affixed to your Surat Kebenaran Merancang






But hang on Kids ! We have more ! We are not done yet ! Remember 13 pages ago, there still the Pengesahan Kebenaran Merancang ? Of course you forgot ! You lowyatt hipsters were taking a break at 3 pm to call it quits for the day. You hard working people =)


Lets take a look shall we, unless you have gone on holiday because your feelings got too hurt by accidentally letting a pen drop to the floor. Poor lowyatt hipsters, just cant take it nowadays. Not built tough I tell ya. Damn ukulele listening ma fackas. 

Heres your Pengesahan Kebenaran Merancang MBPJ or Development Order Validation by MBPJ. A Pengesahan, on the Surat Kebenaran Merancang. Should just be 1 document if you ask me, An approval FOR whats been approved. Huh ? You sure you are Sure ?

Pengesahan Surat Kebenaran Merancang MBPJ Page 1 : Says once again who my wife and I are, lot number, etc etc. for the 259th time

Pengesahan Surat Kebenaran Merancang MBPJ Page 2 : This has been approved by the relevant departments. 

Also affixed will be a copy of your plans endorsed by the MBPJ Planning Department





And,..... thats all =). Done. Finish. 

What do you do now ? You email this immediately to your :-

1. Architect
2. Draftman
3. Engineer

So that they can begin the next step of Pelan Bangunan MBPJ. And now wait 3 to 4 more months if they have not been fully prepared to submit their documents, or it could just take 3 to 4 more months, cant give a fuck anymore, but I hope all will be well by February 2019 to knock the fucker down.

Some may have a questions in their gut that asks, "can I stomach this ? Is it really worth it ? Do I have the stamina and endurance to do this ? What will it cost me ? "

and the hardest question of all :  " Its 1 year to get this step done". 

Do you even know what the feeling is like ? BRUH ? when you ask that question ? 1 year just for 1 fuckin step ? Not lowyatt hipsters. You got to be brave to take this kind of a step.

To me, it has taught me a lot about myself, breaking down, building myself up again, drive to push forward with idiots and holidays. But this is what I can share. With MBPJ you must know that they are really REALLY a slow bunch with NO Urgency, no 6 months can get approval wan wor. Im sure you can, if you have a quarter of the gift of brains from a lowyatt folk, but not me. 

Would I do it again ?

You bet I would, and know YOU and I know now what to look for. I only hope that whoever discovers this blog. I am more experienced now, and YOU and I now know what to look  for that delays shit  :-

- Holidays and fucking holidays. Paired well with an election year = fuck me.
- Observing when to submit things and mastering that
- Run some events concurrently to save time


Why did I do it ?

If you had a feeling that things were not going to go well anyway, the least you can do is share your experience / blog / write a book / lowyatt about your worries OR do something about it. But I am here, standing as a lone wolf by myself. For the other wolves that would like to take this on, here is my path I share with you. 

I blog here because it shows not only what it takes, and took, but what to look out for. I left no rock unmarked, no stone unturned, river uncrossed, if I am missing something, then you best let me know, cause lowyatt folks aint got SHIT to tell me for advise otherwise. 

I dont keep to myself, I dont "pm me 4 mo info on da side " I share for anyone and everyone who wants to walk down this path. And if you are just like me, I am glad we know each other better now. Anyway, someones gotta lead the way than lowyatt folks in the chat rooms giving incomplete information. Right ? In this day and age, in Petaling Jaya, wanting to renovate or rebuild and you cant get information online EVEN from MBPJ thoroughly the complete steps, then someone has got to document it.


Exactly how I feel right now. No Im not a Husky, you STUPID Cheras lowyatt folks


What happens next ?

I wait for my Engineers Plans, so I can send it to contractors to receive quotes like Mr. Eng Hoe and Mr. Eric. And so I can also get my Building Plan / Pelan Bangunan submissions with MBPJ on the way.
Ong Ong Mali Ong ! CNY 2019 Contractor Con !


How will this blog change now ?

From here, there will be 2 topics that will run concurrently, the topics will be Pelan Bangunan MBPJ or Building Plans MBPJ Submissions, and the Contractors. Cause while the Building Plans are being submitted, its time to ask contractors for quotes so that a decision for a contractor can be approved in conjunction with Building Plan approvals.

I hope the Building Plans will not take that long as the Kebenaran Merancang is a pre approval process by itself. One contractor says about 3 months. Lets see.

Next week, its all about the Engineers Plans, thank you all for watching this blog, secretly while eating your avacado toast and chai lattes, I really enjoyed the time here. I am going to celebrate a little tonight.

With this I say the Season Finale has officially ended with the Kebenaran Merancang process for House Renovations with MBPJ.

Thank you once again and stay tuned.

Tuesday, November 27, 2018

Kelulusan Kebenaran Merancang

Today is the 28th of November. It is a good day, it means that not only did I get married 6 years ago, but also my Wife and I got the news that we have finally completed the whole process of MBPJ's Kebenaran Merancang / Development Order.

It has taken the best of 11 months, and 5 days to be exact ever since I first met the MBPJ officer (23rd December 2017) and today, things are finally over. No more shitty work. However lowyatt hipsters can get everything done like A-B-C in 3 days.

The process here finally is complete. Tonight, I may rejoice with some drinks, and say thank you God, I have come this far which has been the hardest, toughest, and longest part of getting approvals sorted.

I will be posting again tomorrow to show you all what I will receive as documents and what will be needed to be done. The Structural Engineer is almost done for the submissions for the Building Plans / Pelan Bangunan for MBPJ, our Architect and Draftsman are all ready as well to do more work, and by that its more paper work for MBPJ and their love for it. Just posting a quick one here for a joyous occassion. Our topic in the weeks that follow will shift to about contractors and the Pelan Bangunan / Building Plan's process. Lowyatt hipsters definitely will be looking forward to this.

For you lowyatt hipsters, stay tuned because your God status online will just about to get bigger and more knowledgeable once you view my final documents for the Kebenaran Merancang at MBPJ  while eating your avacado toast and chai latte. Then you can "pm me on da side 4 more info" all you want. So glad this process is finally over, stay tuned as I will be showing you tomorrow what are the full documents received for the final Kebenaran Merancang approval from MBPJ.

Stay Tuned for the Season Finale of MBPJ's Kebenaran Merancang for Home Renovations 2019. It is bound to be an extra special one. I will make sure of that. So please view the next posting tomorrow as it goes up. =)

Meanwhile, Happy Belated Diwali for the month of November. To all, may the Christmas Trees come up the next day as always  =) So courteous Cheras Lowyatt folks are. Because nothing beats Diwali like Christmas Trees being put up the same time.


Friday, October 26, 2018

MBPJ Kelulusan Kebenaran Merancang + Endorsement House Renovation

Its the 25th of October, 5 days before the General Meeting at MBPJ. I have some news now.

I met the MBPJ officer who hands me 3 kinds of documents :-

10 copies of the Plans, 
Kelulusan Kebenaran Merancang & 
Surat Aku Janji to be endorsed by a Commissioner for Oaths.

Turns out MBPJ like any Malaysian Government organization, loves more and more paper work.

I received the documents, I signed them, my wife signs them.

1. ENDORSEMENT PLANS - 10 COPIES



10 Plans, because 1 is just not enough. Highligted in Red on all 10 plans are the conditions of the Kelulusan Kebenaran Merancang / Development Order Approval



2. KELULUSAN KEBENARAN MERANCANG MBPJ


I am also handed a document for my Development Order Approval / Kelulusan Kebenaran Merancang that has a 14 page document, (yes more pages) inclusive of a SURAT AKU JANJI to which I had to go to a commissioner for oaths to get acknowledged as well.


Now what this says here is basically the Rules and Regulations of what to expect. Its about 10 pages long. Covers everything from  your Work Hours during construction thats from 8 AM to 6 PM max Monday to Sunday (like anybody follows or obeys doing plastering work on Sundays) to things like your Heavy Trucks running on your roads etc. that needs approvals (like any contractor seriously applies). Anyway it has all sorts of stuff which a contractor will ask you to even take Insurance for. Why ? Because just in case something happens, you the Developer, will be liable.

When you receive this document, read it carefully. It will explain all the terms and conditions and remedies as well. These conditions are also mentioned on the 10 Endorsement Plans.

Here are some examples :


The front page is actually attention-ed to the Town Planner for our Home. But this document belongs to you.


Some of the conditions or "Syarat" that mention the total height of the building permitted 

 In this condition it mentions your working hours permitted and the notice board to put up when you start demolishing / renovating your premise





3. SURAT AKU JANJI (Bust out an acapella guys, "I sweaaaar, by the moon and the stars and the ..."


This letter will be given to you. You will need to find a Commissioner of Oaths, anyone will do, from anywhere. Even from Klang, its alright. It is to ensure you agree to the terms of the Kelulusan Kebenaran Merancang MBPJ for your House Renovations.

Once this document is signed, the MBPJ Officer will take it back. So make a copy.

What does it look like ? Here it is below for Lowyat folks :-



So I had to go to the Commissioner for Oaths the next day. From what I can say, I could recommend this place :

Need a Commisioner for Oaths in PJ ? Lowyatt folks can go to SS2 to this place. Fast, quick, and cost 4 bucks for your documents to be chopped and signed


This lady maam works super fast, was in and out in 5 minutes. To get your Commissioner of Oaths signature from here, the cost was just 4 bucks.


So that got taken cared of this morning.


Now I have

1. Handed back these documents back to the MBPJ Officer who will then - 
2. Submit this back to the -
3. Town Planner who will sign them and then - 
4. Submit it back to the - 
5. Planning Department at MBPJ who will then 
6. Get the plans endorsed by the Director and assistant Director of MBPJ's Planning Department.

And then, yes then my chai latte avacado toast lowyatt hipsters, THEN, we are DONE with Kebenaran Merancang and it will be finally over.

When that happens ? Ill certainly treat myself to one of those lowyatt wagyu steaks that lowyatt folks and contractors have for dinner every evening at Marinis on 57.

Im guessing it will still take another month to complete the journey on the Kebenaran Merancang for our Home Renovation in Petaling Jaya, BUT Keep in mind, there is still the Building Plans / Pelan Bangunan that needs approval. But this will take 1 - 2 months in addition for approvals.

By Chinese New Year next year, or just after, We should have the place flattened. And with more hair loss that lowyat people will never understand with their ipads checking out this blog to get upgraded to God Status.



WHAT TO DO NOW :

1. ENGINEERS PLANS
Get this done NOW. As soon as you can, this is where remember our Soil Investigation done last year in August 2017 ? We will need to know what size of footings to use, ground, ceiling and floor beams.

The rush is now on to get your Engineers Plans.

The reason for this is because unlike Architects Plans that are only useful for ID hipsters who will begin imagining every generic over saturated hipster themed industrial ala nonya style theme with pathetic framed slogans and charge you for your lack of brain cells that were not created for being more creative, a hefty penny, (boy that was a handful), your ENGINEERS PLANS are what your CONTRACTORS NEED. 

I miss this red shirt dude I call Gus. Soil Penetration done in August 2017

You will need to submit this as fast as you can to your contractors so they will be able to quote you correctly based on the Engineers Plans. Submit your .dwg autocad drawings to the Engineer who will then start drawing the footings and beams etc.

The Engineer will also submit the Soil Investigation for Building Plans / Pelan Bangunan as well. The Soil Investigation report is a huge document. That I cant post all of it here. So the Soil Investigation Report was important after all. We are not building something out of guess work.

This is very important because you will need to move swiftly to point number 2 as well.


2. CONTACTORS
It is just about this stage when you must already have about 3 contractors in hand. I have chosen to look at 5 for comparison purposes to make a decision. So far I have found 3. All CIDB certified. No Eric and Eng Hoe's here.
Lai Lai Lai, Conman Contractor. I smell money in my pocket this 2019 CNY

If you cant find enough contractors that are CIDB certified, just head over to the CIDB website at the following link so you can look up contractors from G1 - even G7. In my case, I just need up to a G2 contractor that is allowed up to 500k for contracts. You can look up yourself what G1 - G7 means.




3. ARCHITECT
As soon as you sit down with your engineer, get your Architect ready as well for the plans to be submitted for your Building Plans / Pelan Bangunan.

Okay folks, I will only blog next when all is done. So its going to be about another month, end of November before things are all done. Please stay tuned as always.

--------------------------------------------------------------------------------------------------------------------------

ALSO TO START LOOKING AT 

It is a good time to also start looking at 2 things. Electrical and Plumbing. They too will need to be CIDB Certified if you want your home to obtain a CCC( Certificate of Compliance and Completion)


ELECTRICAL 
Its not just about looking at how many lights, fans, airconds, water heaters and plug points that is important alone. You will need to know some knowledge about cables, wires, DB Boxes, MCB's Amps etc and what wire thicknesses you will like to use. And if there's any looping involved for switeches.

PLUMBING
A good time to start researching the different materials for your plumbing. Your material that you would like to use for your incoming hoses, water pump, what kind of plastics you would be using and where. Some pipes will just need a HDPE pipe for outdoors, most will use Class 6 / 7 UPVC for indoors. Lowyatt folks use Gold of course.

Even your sewage pipe materials that you would like to use will make a difference as well. So do some research. Lowyatt folks also use Gold for their sewage pipes too. Because their poop comes from Mount Olympus.

To this I will give lowyat credit where its due. There are many articles that have been covered on these things so Im not going to delve any further. Yes, the one and only time lowyatt folks get credit. Thats all.

--------------------------------------------------------------------------------------------------------------------------

I wont blog any further till all is done with my Kebenaran Merancang officially. I will post again very soon. We will move into the Building Plans / Pelan Bangunan with MBPJ soon and have more to cover on this.

Monday, October 1, 2018

MBPJ OSC Meeting Approved Finally - Kelulusan Mesyuarat OSC

Its 6 45 PM, the 1st of October, the beginning of the last quarter of the year. I Just got a message from the MBPJ Officer saying that the OSC Meeting has had good news and my plans have been appoved.

Turns out that the OSC meeting was held in Johor this time. I guess it was probably due to the PKR Johor elections that caused council members to lend their support in Johor.

Looking at the OSC Online, nothing has been uploaded yet, but I hope there's something that gets posted soon to show you all.

Today I get to relax a moment.

Months of bitching, fighting, arguing and to get to this point have now come to some relief. Its not the end yet because down below, is some shitty news.

But its a relief that plans have been approved by those who matter most. That too without the help of our 58k Architect friends that said "My father MAY know someone on the board". 

WHAT NOW ?

Now, we have to wait for whats called a Mesyuarat Penuh Bulanan MBPJ that comes 1 time a month. Yes once a month. Yes, more waiting. Because waiting and paperwork is what Malaysians excel in life at Government offices :)

So it looks like another 4 weeks will have to pass by before that takes place. Traditionally it is no later than the 28th of every month. But it looks like I really have the best of all luck, for this month its on the 30th  :)

Yes, its on the 30th of October which is a whole month away. That could mean Im getting the full 67 days grunt of the MBPJ approval time :)


You can find the OSC and Mesyuarat Majlis meetings here at the following link every month :-

http://www.mbpj.gov.my/ms/rakyat/jadual-minit-mesyuarat


Its shitty that our OSC Meeting in Spetember was held 2 days AFTER the MBPJ Full Meeting. Now I will have to wait till the 30th of October. This makes up for a 33 day loss. Goyang telur la apa lagi ? Makan kuih minum teh



In Conclusion : Time your OSC Meeting and your MBPJ Full Meeting well.

Can you imagine if I had submitted my plans for the OSC meeting above on the 22nd, and could have got approvals by MBPJ Full meeting on the 30th. Thats just progress in 8 short days. As compared to my 33 day goyang telur wait.

These political issues this year have fucked things up pretty well. Which is very annoying.....no, frustrating. I have lost a total of over 30 days based on pre elections, 2 days post elections and now 33 days more.  

But Im sure lowyatt hipsters, Eng Hoe and Eric contractors can solve even an annual monthly meeting for you by the end of the day. Because they are Gods given knowledge to how the world works. 

See you guys again, just before the month ends. And to you lowyatt hipsters :- 

Que sound *** Door latch opens ***

- LEVEL UNLOCKED -


Now you lowyatt hipsters can do more "PM me on the side" after reading this from your Cheras bedrooms. :)



UPDATE : 3/10/2018

3rd October 2018, turns out that on the 2nd of October, OSC Online had uploaded their OSC Meeting Approval letter.

Dear lowyatt hipsters, this is just an update for your God status to be unlocked so you can now "PM Me On The Side"


It says 2nd October at 6 pm in the evening

Clicking on the feedback this is what it says





MBPJ OSC Online Approval Letter

Try looking up MBPJ OSC Meeting Kelulusan for House Renovations online. Im sure you will be able to find information on lowyatt.

Now folks, you must note here that with this letter, it only concludes what MBPJ OSC Councillors have approved my plans during their meeting.

Planning Department will officially send the Surat Kelulusan soon. They have after all, all the time in the world to do this before the 30th of October.

We have 4 more steps to go to complete Kebenaran Merancang now. 

Wednesday, September 26, 2018

MBPJ OSC Meeting House Renovation

Today is the 27th of September. That means one thing. Its the day that Google was born 20 years ago and for me personally, its the day that MBPJ is having their One Stop Center Meeting to approve my documents.

I totally forgot to tell the Councillors  about the meeting date. But oh well, pray hard with fingers crossed. I have done the best I could, the councilors ARE aware of my project number anyway. If it doesnt pass, then someone has not been doing their work. Im confident all will be well anyway since the OSC Online has been approved, Engineering, Health and Planning Department has approved things anyway. So it should be a matter of sign and be done with during the MBPJ OSC Meeting for my home renovation.

I wanted to post here what it looks like on the MBPJ Website while waiting for the MBPJ One Stop Center to come back with approvals.


This shows the location to check your status for the MBPJ OSC Meeting Approval for your house renovation

This means that the MBPJ OSC Meeting is still taking place


Now we wait and ill check every now and then for a status update. Yay !

Tuesday, September 18, 2018

Hardcopies + Planning Division MBPJ & Pre OSC Meeting

Since the 2nd of August, a few events have now suddenly taken place. I have not blogged here for a month plus and for good reason too since I was in Australia. Had fun though with all sorts of beer and ale, bad weather was even better. I love the cold and while many shy away from it, I would rather catch a nasty cold than stay warm inside.


While I was abroad, a few other developments took place. Our Softcopy was finally approved. Which is a big relief. Which means our Hardcopies can be submitted. So now this is what has happened


1. Hardcopies of documents have been submitted by the MBPJ Planning Department Officer to MBPJ OSC because soft copy documents have been all approved
Remember these documents ? Turns out the total amount of documents are 21 docments required in total. So all these Softcopy Documents have been now submitted in Hardcopy to MBPJ OSC

2. MBPJ Planning Department is waiting to submit our Hardcopies to the MBPJ OSC Meeting set to take place on the 27th of September. I have been waiting since the 28th of August  for this. 


The real countdown to a month to approve or maximum 67 days to approve has already started from the day the MBPJ Planning Division Officer received my documents which was on the 28th of August. This is where the real fun begins. Im sure it will mean EXCLUDING HOLIDAYS


If you have been following the blog, remember it says 1 bulan - 67 hari. So lets count it as 8th December for the heck of it. Because Im sure these assholes do not count holidays and weekends. This document was written by the MBPJ Officer on the 23rd of December 2017

Why the whole month before being able to get our documents in the MBPJ OSC Meeting for approval ? Why cannot hor immediately ? Why ah ? This is why and how it works. View below :-

1. MBPJ Planning Department Officer in charge submits Hardcopy documents to MBPJ OSC Division 

2. OSC at MBPJ then Distributes these documents to relevant authorities 

3. Relevant Authorities such as Health Department as well as Engineering Department will also review your documents aaaaaaand theeeeeeeeen

4. Relevant Authorities and Departments will then comment and approve your documents before

5. Being able to have your Hardcopies sent in for the next MBPJ One Stop Centre Meeting


In summary : MBPJ Planning Department - MBPJ OSC Department - Health Department - Engineering Department - MBPJ OSC Meeting

Department, after department, after department, after department, back to department. Because Malaysians love paperwork, departments and buildings with tinted black windows filled with files in cabinets and fluorescent lights.

Anyone care to correct me if Im wrong ? Lowyatt folks ? Chai Latte drinking Lowyatt folks who say submissions are as easy as A-B-C to get a home loan ?



MBPJ OSC Online comments back from various departments. Note words such as Tiada Halangan etc. This means the authorities concern have approved the plans. I have highlighted stuff in Orange as well

Only once the relevant departments have approved your submissions and have given their consent, can your hardcopy plans be put into the next meeting.


*** UPDATE 21 September 2018


21st September 2018, MBPJ Planning Department says Planning has been complied with. So apa lagi ? Wait till MBPJ OSC Meeting lah for signature and approval on the 27th of September. Goyang telur till then

The next OSC Meeting at MBPJ will be on the 27th of September. I have been waiting almost a whole month. So now we wait, and wait,.... and wait summore till the 27th of September for the MBPJ OSC Meeting.

Now we wait till the end of the month in anticipation. Somewhere, in the near future, all these submissions will come to an end, and the new chapter of Eric and Eng Hoe conman contractors will pop up.

With that too, so will this blog's persona and topics. Im really looking forward to that. Been blogging for your lowyatt champagne drinking 3pm hipsters for a while now.

Damn lowyatt contractors drinking Krystal


Thursday, August 2, 2018

OSC Surat Online Comments Rejection for House Demolish and Rebuild MBPJ

2nd August, time for an update since the last post.

Now not everyone will get things right done the first time. But Im glad its only minor comments in my case. Its certainly lesser than first time application for my drawings being submitted. The push is on to submit documents to move on to the major step which is for the OSC Meeting.

I will show you as well what this looks like when you are logging in and where you can view your documents submitted and check for any status update from OSC. MBPJ OSC is pretty fast at giving comments back for your documents that are either lacking / incorrect.They are pretty fast in my case. Its we who are slow.

I didnt cover this in my last post properly. So I shall show you lowyatt hipsters now how. Here is how to do it :


STEP 1. GO TO THE OSC ONLINE WEBSITE AND CLICK ON PEMILIK PROJEK

Click on PEMILIK PROJEK 


STEP 2 LOG IN WITH YOUR PASSWORD


Insert your IC and Password thats been given to you



STEP 3. LOOK FOR e-PEMOHONAN SAYA AND CLICK

Look up e-Pemohonan Saya. Click on it


STEP 4. LOOK UP YOUR PROJECT REFERENCE NUMBER 


Click on your Project's ID. This is where you will be able to view the most important page that has your uploaded documents required by the MBPJ OSC Online. It is Highlighted in Blue. 


STEP 5. VIEW ANY COMMENTS FROM MBPJ

Click on Ulusan Urusetia (Secretariat Review in English). Do this to see whatever comments OSC has submitted back to you. This will be a PDF Document that you will open and see such as below

At MBPJ this is what your rejection letter from OSC looks like from the OSC when it comes to applying for your Surat Online OSC.

Its been almost 2 weeks since submitting our documents for OSC Online. It is we who have been slow. We submitted our documents between the 24 - 25th of July and we got our feedback within a day.

We have some feedback from the One Stop Centre. Looks like we didnt upload things fully.
We received 4 comments back from the One Stop Centre. This is what we received back from the OSC. This is the PDF Format we received from "Ulasan Uresetia" when clicked



Well fuck me. Some stuff didnt get uploaded such as the OSC Checklist with the Borang A (Kawalan Serangga), Permohonan OSC and Title search.

Now look here, where its highlighted in Orange. I have 30 days to resubmit things which puts us wonderfully in the week of Merdeka. Another Holiday, yup.

15 / 19ish documents (OSC Checklist and Borang A - Kawalan Serangga are one document) that required submission are kind alright. But 4 documents were not uploaded. 

Can you imagine the website being down ? Thats what happened as well. And keep in mind, the MBPJ website isnt the most stable website ever created for the people of Petaling Jaya. 

These documents are really lengthy and laborious. If you were to take a look at each document, it requires chops, signatures bla bla bla and a whole load of gibberish. On top of that, the 20 meter radius of all your neighbours too have to go through a title search and that too involves digging up their information. I had 11 neighbours to dig up because they are within a 20 meter radius from me. 

All this work requires time and effort and somewhere something is not going to happen as well. So you see, its not as easy as 1-2-3 according to lowyatt folks like Mr. Eric.

Disheartened now ? Not me. You lowyatt hipsters definitely wont be disheartened because you hold the keys and and answers with God status for lowyatt like you do this process everyday. So you are never disheartened while eating avacado toast for 35 Ringgit before finishing work at 3 30 PM from your hipster cafe to have Champagne in the evenings.

It makes me wonder, how many people who have not even written their project titles on their signboards will take before their submissions for OSC Online are even done. Where are they in their progress ? Guess they work with Mr. Eng Hoe & Mr. Eric.

Now you lowyatt folks can document this experience in your hipster scrap book while eating your avacado toast and telling people to "PM me on the side".

Will have another update very soon once our documents are completed.

Monday, July 23, 2018

OSC Online MBPJ House Demolish / Renovation

SUBMITTING FOR OSC ONLINE

There are 2 things required when you are submitting your documents for OSC Online

1. Your Softcopy of your documents submitted by a "qualified" person in which case mine was the MBPJ officer

2. Town Planner submission of the same documents to MBPJ

Why this is the case is beyond my understanding. I know MBPJ is practicing ISO or "International Standards of Operation" and all but this doesnt make sense.

On the 10th  - 12th of July officers were also unavailable due to some fucking "kursus". But its ok. As it turns out it was good considering my latest Cukai Pintu had to be submitted. Thats right, they had my old Cukai Pintu and now luckily I had my new one with the payment slip as well.

On the 13th of July - Friday the 13th, I met the MBPJ officer in the morning to submit my latest Cukai Taksiran / Cukai Pintu / Assesment for his submission for OSC Online. This whole process to obtain Surat Online will take 2 weeks with all required documents from the checklist from your IC to your Geran. Thats IF there are no hiccups.

On the 23rd of July both parties - "Qualified Person" & Town Planner had submitted the documents for Surat Online. Turns out that the MBPJ website has had some issues with submissions but we finally were able to get this in. So I doubt I will have my Surat Online in the next 4 days as 10 days have already passed.

Here is what it looks like for OSC Online Submissions


SUBMISSION BY QUALIFIED PERSONNEL / MBPJ OFFICER





I can now check online for any status or progress of my documents. I now have an account with MBPJ


SUBMISSION BY TOWN PLANNER



Its almost practically the same document except that the town planner states that the purpose of the submission of these documents is for Kebenaran Merancang / Development Order



WHAT HAPPENS NOW ?

1. We wait to see what happens in a week if there is any feedback from the One Stop Centre

2. Inform your Councillor that you have submitted your documents for OSC Online. I have informed my Adun / Assemblyman and now my local Councillor as well on the OSC Board.

3. Lowyatt People will be advising blind other lowyatt people who dont know what it takes to renovate in Petaling Jaya to "PM Me on the side"


Ok, thats all for this week. Hope that the Surat Online will pass well. Today marks 7 months since first meeting the MBPJ Officer. 5 more months before it comes a year. Will this project ever kick off before that ?

I will post next on the Surat Online when it's ready. Meantime we can only sit and wait for more holidays such as Merdeka and Malaysia Day and other holidays that will have no implications

And then, there were 4 of Us ! - CAT & DOG

This is a Lengthy post, and a real tough, but absolutely 180 turn around in life. Goodbye, old Friend In 2021, the Home was being finished t...